test: split up long-running tests
gtests runs testcases sequentially as part of a test suite which is causing long test runs. Split up the tests into separate files to optimize test run duration.
T
test: split up long-running tests
gtests runs testcases sequentially as part of a test suite which is causing long test runs. Split up the tests into separate files to optimize test run duration.
Test suite definition is done via `suite.hpp`/`suite.cpp`.
There is a tradeoff here since the test folder structure now does not directly mirror the source folder structure anymore. The folder name is chosen to clarify which implementation file is being tested.
Timeouts inside testcases are not touched, it is assumed these were chosen correctly.
In case of fdio_timed there is dependency on a folder, which is made unique via `getpid()` call to avoid races.
Command: `time ninja -C build test`
Before: (as of current master branch, commit `c6fee5a94bbb4b4fbb6212942f0f2cfa3049c255`) ``` real 0m18.581s user 0m9.977s sys 0m5.494s ```
After: ``` real 0m6.430s user 0m10.021s sys 0m5.501s ```
Change-Id: I2ba096cb8f9d8ffcc146448d22b7e75a1c25d103 Signed-off-by: Alexander Hansen <alexander.hansen@9elements.com>