1.. SPDX-License-Identifier: GPL-2.0 2 3==================== 4Utilization Clamping 5==================== 6 71. Introduction 8=============== 9 10Utilization clamping, also known as util clamp or uclamp, is a scheduler 11feature that allows user space to help in managing the performance requirement 12of tasks. It was introduced in v5.3 release. The CGroup support was merged in 13v5.4. 14 15Uclamp is a hinting mechanism that allows the scheduler to understand the 16performance requirements and restrictions of the tasks, thus it helps the 17scheduler to make a better decision. And when schedutil cpufreq governor is 18used, util clamp will influence the CPU frequency selection as well. 19 20Since the scheduler and schedutil are both driven by PELT (util_avg) signals, 21util clamp acts on that to achieve its goal by clamping the signal to a certain 22point; hence the name. That is, by clamping utilization we are making the 23system run at a certain performance point. 24 25The right way to view util clamp is as a mechanism to make request or hint on 26performance constraints. It consists of two tunables: 27 28 * UCLAMP_MIN, which sets the lower bound. 29 * UCLAMP_MAX, which sets the upper bound. 30 31These two bounds will ensure a task will operate within this performance range 32of the system. UCLAMP_MIN implies boosting a task, while UCLAMP_MAX implies 33capping a task. 34 35One can tell the system (scheduler) that some tasks require a minimum 36performance point to operate at to deliver the desired user experience. Or one 37can tell the system that some tasks should be restricted from consuming too 38much resources and should not go above a specific performance point. Viewing 39the uclamp values as performance points rather than utilization is a better 40abstraction from user space point of view. 41 42As an example, a game can use util clamp to form a feedback loop with its 43perceived Frames Per Second (FPS). It can dynamically increase the minimum 44performance point required by its display pipeline to ensure no frame is 45dropped. It can also dynamically 'prime' up these tasks if it knows in the 46coming few hundred milliseconds a computationally intensive scene is about to 47happen. 48 49On mobile hardware where the capability of the devices varies a lot, this 50dynamic feedback loop offers a great flexibility to ensure best user experience 51given the capabilities of any system. 52 53Of course a static configuration is possible too. The exact usage will depend 54on the system, application and the desired outcome. 55 56Another example is in Android where tasks are classified as background, 57foreground, top-app, etc. Util clamp can be used to constrain how much 58resources background tasks are consuming by capping the performance point they 59can run at. This constraint helps reserve resources for important tasks, like 60the ones belonging to the currently active app (top-app group). Beside this 61helps in limiting how much power they consume. This can be more obvious in 62heterogeneous systems (e.g. Arm big.LITTLE); the constraint will help bias the 63background tasks to stay on the little cores which will ensure that: 64 65 1. The big cores are free to run top-app tasks immediately. top-app 66 tasks are the tasks the user is currently interacting with, hence 67 the most important tasks in the system. 68 2. They don't run on a power hungry core and drain battery even if they 69 are CPU intensive tasks. 70 71.. note:: 72 **little cores**: 73 CPUs with capacity < 1024 74 75 **big cores**: 76 CPUs with capacity = 1024 77 78By making these uclamp performance requests, or rather hints, user space can 79ensure system resources are used optimally to deliver the best possible user 80experience. 81 82Another use case is to help with **overcoming the ramp up latency inherit in 83how scheduler utilization signal is calculated**. 84 85On the other hand, a busy task for instance that requires to run at maximum 86performance point will suffer a delay of ~200ms (PELT HALFIFE = 32ms) for the 87scheduler to realize that. This is known to affect workloads like gaming on 88mobile devices where frames will drop due to slow response time to select the 89higher frequency required for the tasks to finish their work in time. Setting 90UCLAMP_MIN=1024 will ensure such tasks will always see the highest performance 91level when they start running. 92 93The overall visible effect goes beyond better perceived user 94experience/performance and stretches to help achieve a better overall 95performance/watt if used effectively. 96 97User space can form a feedback loop with the thermal subsystem too to ensure 98the device doesn't heat up to the point where it will throttle. 99 100Both SCHED_NORMAL/OTHER and SCHED_FIFO/RR honour uclamp requests/hints. 101 102In the SCHED_FIFO/RR case, uclamp gives the option to run RT tasks at any 103performance point rather than being tied to MAX frequency all the time. Which 104can be useful on general purpose systems that run on battery powered devices. 105 106Note that by design RT tasks don't have per-task PELT signal and must always 107run at a constant frequency to combat undeterministic DVFS rampup delays. 108 109Note that using schedutil always implies a single delay to modify the frequency 110when an RT task wakes up. This cost is unchanged by using uclamp. Uclamp only 111helps picking what frequency to request instead of schedutil always requesting 112MAX for all RT tasks. 113 114See :ref:`section 3.4 <uclamp-default-values>` for default values and 115:ref:`3.4.1 <sched-util-clamp-min-rt-default>` on how to change RT tasks 116default value. 117 1182. Design 119========= 120 121Util clamp is a property of every task in the system. It sets the boundaries of 122its utilization signal; acting as a bias mechanism that influences certain 123decisions within the scheduler. 124 125The actual utilization signal of a task is never clamped in reality. If you 126inspect PELT signals at any point of time you should continue to see them as 127they are intact. Clamping happens only when needed, e.g: when a task wakes up 128and the scheduler needs to select a suitable CPU for it to run on. 129 130Since the goal of util clamp is to allow requesting a minimum and maximum 131performance point for a task to run on, it must be able to influence the 132frequency selection as well as task placement to be most effective. Both of 133which have implications on the utilization value at CPU runqueue (rq for short) 134level, which brings us to the main design challenge. 135 136When a task wakes up on an rq, the utilization signal of the rq will be 137affected by the uclamp settings of all the tasks enqueued on it. For example if 138a task requests to run at UTIL_MIN = 512, then the util signal of the rq needs 139to respect to this request as well as all other requests from all of the 140enqueued tasks. 141 142To be able to aggregate the util clamp value of all the tasks attached to the 143rq, uclamp must do some housekeeping at every enqueue/dequeue, which is the 144scheduler hot path. Hence care must be taken since any slow down will have 145significant impact on a lot of use cases and could hinder its usability in 146practice. 147 148The way this is handled is by dividing the utilization range into buckets 149(struct uclamp_bucket) which allows us to reduce the search space from every 150task on the rq to only a subset of tasks on the top-most bucket. 151 152When a task is enqueued, the counter in the matching bucket is incremented, 153and on dequeue it is decremented. This makes keeping track of the effective 154uclamp value at rq level a lot easier. 155 156As tasks are enqueued and dequeued, we keep track of the current effective 157uclamp value of the rq. See :ref:`section 2.1 <uclamp-buckets>` for details on 158how this works. 159 160Later at any path that wants to identify the effective uclamp value of the rq, 161it will simply need to read this effective uclamp value of the rq at that exact 162moment of time it needs to take a decision. 163 164For task placement case, only Energy Aware and Capacity Aware Scheduling 165(EAS/CAS) make use of uclamp for now, which implies that it is applied on 166heterogeneous systems only. 167When a task wakes up, the scheduler will look at the current effective uclamp 168value of every rq and compare it with the potential new value if the task were 169to be enqueued there. Favoring the rq that will end up with the most energy 170efficient combination. 171 172Similarly in schedutil, when it needs to make a frequency update it will look 173at the current effective uclamp value of the rq which is influenced by the set 174of tasks currently enqueued there and select the appropriate frequency that 175will satisfy constraints from requests. 176 177Other paths like setting overutilization state (which effectively disables EAS) 178make use of uclamp as well. Such cases are considered necessary housekeeping to 179allow the 2 main use cases above and will not be covered in detail here as they 180could change with implementation details. 181 182.. _uclamp-buckets: 183 1842.1. Buckets 185------------ 186 187:: 188 189 [struct rq] 190 191 (bottom) (top) 192 193 0 1024 194 | | 195 +-----------+-----------+-----------+---- ----+-----------+ 196 | Bucket 0 | Bucket 1 | Bucket 2 | ... | Bucket N | 197 +-----------+-----------+-----------+---- ----+-----------+ 198 : : : 199 +- p0 +- p3 +- p4 200 : : 201 +- p1 +- p5 202 : 203 +- p2 204 205 206.. note:: 207 The diagram above is an illustration rather than a true depiction of the 208 internal data structure. 209 210To reduce the search space when trying to decide the effective uclamp value of 211an rq as tasks are enqueued/dequeued, the whole utilization range is divided 212into N buckets where N is configured at compile time by setting 213CONFIG_UCLAMP_BUCKETS_COUNT. By default it is set to 5. 214 215The rq has a bucket for each uclamp_id tunables: [UCLAMP_MIN, UCLAMP_MAX]. 216 217The range of each bucket is 1024/N. For example, for the default value of 2185 there will be 5 buckets, each of which will cover the following range: 219 220:: 221 222 DELTA = round_closest(1024/5) = 204.8 = 205 223 224 Bucket 0: [0:204] 225 Bucket 1: [205:409] 226 Bucket 2: [410:614] 227 Bucket 3: [615:819] 228 Bucket 4: [820:1024] 229 230When a task p with following tunable parameters 231 232:: 233 234 p->uclamp[UCLAMP_MIN] = 300 235 p->uclamp[UCLAMP_MAX] = 1024 236 237is enqueued into the rq, bucket 1 will be incremented for UCLAMP_MIN and bucket 2384 will be incremented for UCLAMP_MAX to reflect the fact the rq has a task in 239this range. 240 241The rq then keeps track of its current effective uclamp value for each 242uclamp_id. 243 244When a task p is enqueued, the rq value changes to: 245 246:: 247 248 // update bucket logic goes here 249 rq->uclamp[UCLAMP_MIN] = max(rq->uclamp[UCLAMP_MIN], p->uclamp[UCLAMP_MIN]) 250 // repeat for UCLAMP_MAX 251 252Similarly, when p is dequeued the rq value changes to: 253 254:: 255 256 // update bucket logic goes here 257 rq->uclamp[UCLAMP_MIN] = search_top_bucket_for_highest_value() 258 // repeat for UCLAMP_MAX 259 260When all buckets are empty, the rq uclamp values are reset to system defaults. 261See :ref:`section 3.4 <uclamp-default-values>` for details on default values. 262 263 2642.2. Max aggregation 265-------------------- 266 267Util clamp is tuned to honour the request for the task that requires the 268highest performance point. 269 270When multiple tasks are attached to the same rq, then util clamp must make sure 271the task that needs the highest performance point gets it even if there's 272another task that doesn't need it or is disallowed from reaching this point. 273 274For example, if there are multiple tasks attached to an rq with the following 275values: 276 277:: 278 279 p0->uclamp[UCLAMP_MIN] = 300 280 p0->uclamp[UCLAMP_MAX] = 900 281 282 p1->uclamp[UCLAMP_MIN] = 500 283 p1->uclamp[UCLAMP_MAX] = 500 284 285then assuming both p0 and p1 are enqueued to the same rq, both UCLAMP_MIN 286and UCLAMP_MAX become: 287 288:: 289 290 rq->uclamp[UCLAMP_MIN] = max(300, 500) = 500 291 rq->uclamp[UCLAMP_MAX] = max(900, 500) = 900 292 293As we shall see in :ref:`section 5.1 <uclamp-capping-fail>`, this max 294aggregation is the cause of one of limitations when using util clamp, in 295particular for UCLAMP_MAX hint when user space would like to save power. 296 2972.3. Hierarchical aggregation 298----------------------------- 299 300As stated earlier, util clamp is a property of every task in the system. But 301the actual applied (effective) value can be influenced by more than just the 302request made by the task or another actor on its behalf (middleware library). 303 304The effective util clamp value of any task is restricted as follows: 305 306 1. By the uclamp settings defined by the cgroup CPU controller it is attached 307 to, if any. 308 2. The restricted value in (1) is then further restricted by the system wide 309 uclamp settings. 310 311:ref:`Section 3 <uclamp-interfaces>` discusses the interfaces and will expand 312further on that. 313 314For now suffice to say that if a task makes a request, its actual effective 315value will have to adhere to some restrictions imposed by cgroup and system 316wide settings. 317 318The system will still accept the request even if effectively will be beyond the 319constraints, but as soon as the task moves to a different cgroup or a sysadmin 320modifies the system settings, the request will be satisfied only if it is 321within new constraints. 322 323In other words, this aggregation will not cause an error when a task changes 324its uclamp values, but rather the system may not be able to satisfy requests 325based on those factors. 326 3272.4. Range 328---------- 329 330Uclamp performance request has the range of 0 to 1024 inclusive. 331 332For cgroup interface percentage is used (that is 0 to 100 inclusive). 333Just like other cgroup interfaces, you can use 'max' instead of 100. 334 335.. _uclamp-interfaces: 336 3373. Interfaces 338============= 339 3403.1. Per task interface 341----------------------- 342 343sched_setattr() syscall was extended to accept two new fields: 344 345* sched_util_min: requests the minimum performance point the system should run 346 at when this task is running. Or lower performance bound. 347* sched_util_max: requests the maximum performance point the system should run 348 at when this task is running. Or upper performance bound. 349 350For example, the following scenario have 40% to 80% utilization constraints: 351 352:: 353 354 attr->sched_util_min = 40% * 1024; 355 attr->sched_util_max = 80% * 1024; 356 357When task @p is running, **the scheduler should try its best to ensure it 358starts at 40% performance level**. If the task runs for a long enough time so 359that its actual utilization goes above 80%, the utilization, or performance 360level, will be capped. 361 362The special value -1 is used to reset the uclamp settings to the system 363default. 364 365Note that resetting the uclamp value to system default using -1 is not the same 366as manually setting uclamp value to system default. This distinction is 367important because as we shall see in system interfaces, the default value for 368RT could be changed. SCHED_NORMAL/OTHER might gain similar knobs too in the 369future. 370 3713.2. cgroup interface 372--------------------- 373 374There are two uclamp related values in the CPU cgroup controller: 375 376* cpu.uclamp.min 377* cpu.uclamp.max 378 379When a task is attached to a CPU controller, its uclamp values will be impacted 380as follows: 381 382* cpu.uclamp.min is a protection as described in :ref:`section 3-3 of cgroup 383 v2 documentation <cgroupv2-protections-distributor>`. 384 385 If a task uclamp_min value is lower than cpu.uclamp.min, then the task will 386 inherit the cgroup cpu.uclamp.min value. 387 388 In a cgroup hierarchy, effective cpu.uclamp.min is the max of (child, 389 parent). 390 391* cpu.uclamp.max is a limit as described in :ref:`section 3-2 of cgroup v2 392 documentation <cgroupv2-limits-distributor>`. 393 394 If a task uclamp_max value is higher than cpu.uclamp.max, then the task will 395 inherit the cgroup cpu.uclamp.max value. 396 397 In a cgroup hierarchy, effective cpu.uclamp.max is the min of (child, 398 parent). 399 400For example, given following parameters: 401 402:: 403 404 p0->uclamp[UCLAMP_MIN] = // system default; 405 p0->uclamp[UCLAMP_MAX] = // system default; 406 407 p1->uclamp[UCLAMP_MIN] = 40% * 1024; 408 p1->uclamp[UCLAMP_MAX] = 50% * 1024; 409 410 cgroup0->cpu.uclamp.min = 20% * 1024; 411 cgroup0->cpu.uclamp.max = 60% * 1024; 412 413 cgroup1->cpu.uclamp.min = 60% * 1024; 414 cgroup1->cpu.uclamp.max = 100% * 1024; 415 416when p0 and p1 are attached to cgroup0, the values become: 417 418:: 419 420 p0->uclamp[UCLAMP_MIN] = cgroup0->cpu.uclamp.min = 20% * 1024; 421 p0->uclamp[UCLAMP_MAX] = cgroup0->cpu.uclamp.max = 60% * 1024; 422 423 p1->uclamp[UCLAMP_MIN] = 40% * 1024; // intact 424 p1->uclamp[UCLAMP_MAX] = 50% * 1024; // intact 425 426when p0 and p1 are attached to cgroup1, these instead become: 427 428:: 429 430 p0->uclamp[UCLAMP_MIN] = cgroup1->cpu.uclamp.min = 60% * 1024; 431 p0->uclamp[UCLAMP_MAX] = cgroup1->cpu.uclamp.max = 100% * 1024; 432 433 p1->uclamp[UCLAMP_MIN] = cgroup1->cpu.uclamp.min = 60% * 1024; 434 p1->uclamp[UCLAMP_MAX] = 50% * 1024; // intact 435 436Note that cgroup interfaces allows cpu.uclamp.max value to be lower than 437cpu.uclamp.min. Other interfaces don't allow that. 438 4393.3. System interface 440--------------------- 441 4423.3.1 sched_util_clamp_min 443-------------------------- 444 445System wide limit of allowed UCLAMP_MIN range. By default it is set to 1024, 446which means that permitted effective UCLAMP_MIN range for tasks is [0:1024]. 447By changing it to 512 for example the range reduces to [0:512]. This is useful 448to restrict how much boosting tasks are allowed to acquire. 449 450Requests from tasks to go above this knob value will still succeed, but 451they won't be satisfied until it is more than p->uclamp[UCLAMP_MIN]. 452 453The value must be smaller than or equal to sched_util_clamp_max. 454 4553.3.2 sched_util_clamp_max 456-------------------------- 457 458System wide limit of allowed UCLAMP_MAX range. By default it is set to 1024, 459which means that permitted effective UCLAMP_MAX range for tasks is [0:1024]. 460 461By changing it to 512 for example the effective allowed range reduces to 462[0:512]. This means is that no task can run above 512, which implies that all 463rqs are restricted too. IOW, the whole system is capped to half its performance 464capacity. 465 466This is useful to restrict the overall maximum performance point of the system. 467For example, it can be handy to limit performance when running low on battery 468or when the system wants to limit access to more energy hungry performance 469levels when it's in idle state or screen is off. 470 471Requests from tasks to go above this knob value will still succeed, but they 472won't be satisfied until it is more than p->uclamp[UCLAMP_MAX]. 473 474The value must be greater than or equal to sched_util_clamp_min. 475 476.. _uclamp-default-values: 477 4783.4. Default values 479------------------- 480 481By default all SCHED_NORMAL/SCHED_OTHER tasks are initialized to: 482 483:: 484 485 p_fair->uclamp[UCLAMP_MIN] = 0 486 p_fair->uclamp[UCLAMP_MAX] = 1024 487 488That is, by default they're boosted to run at the maximum performance point of 489changed at boot or runtime. No argument was made yet as to why we should 490provide this, but can be added in the future. 491 492For SCHED_FIFO/SCHED_RR tasks: 493 494:: 495 496 p_rt->uclamp[UCLAMP_MIN] = 1024 497 p_rt->uclamp[UCLAMP_MAX] = 1024 498 499That is by default they're boosted to run at the maximum performance point of 500the system which retains the historical behavior of the RT tasks. 501 502RT tasks default uclamp_min value can be modified at boot or runtime via 503sysctl. See below section. 504 505.. _sched-util-clamp-min-rt-default: 506 5073.4.1 sched_util_clamp_min_rt_default 508------------------------------------- 509 510Running RT tasks at maximum performance point is expensive on battery powered 511devices and not necessary. To allow system developer to offer good performance 512guarantees for these tasks without pushing it all the way to maximum 513performance point, this sysctl knob allows tuning the best boost value to 514address the system requirement without burning power running at maximum 515performance point all the time. 516 517Application developer are encouraged to use the per task util clamp interface 518to ensure they are performance and power aware. Ideally this knob should be set 519to 0 by system designers and leave the task of managing performance 520requirements to the apps. 521 5224. How to use util clamp 523======================== 524 525Util clamp promotes the concept of user space assisted power and performance 526management. At the scheduler level there is no info required to make the best 527decision. However, with util clamp user space can hint to the scheduler to make 528better decision about task placement and frequency selection. 529 530Best results are achieved by not making any assumptions about the system the 531application is running on and to use it in conjunction with a feedback loop to 532dynamically monitor and adjust. Ultimately this will allow for a better user 533experience at a better perf/watt. 534 535For some systems and use cases, static setup will help to achieve good results. 536Portability will be a problem in this case. How much work one can do at 100, 537200 or 1024 is different for each system. Unless there's a specific target 538system, static setup should be avoided. 539 540There are enough possibilities to create a whole framework based on util clamp 541or self contained app that makes use of it directly. 542 5434.1. Boost important and DVFS-latency-sensitive tasks 544----------------------------------------------------- 545 546A GUI task might not be busy to warrant driving the frequency high when it 547wakes up. However, it requires to finish its work within a specific time window 548to deliver the desired user experience. The right frequency it requires at 549wakeup will be system dependent. On some underpowered systems it will be high, 550on other overpowered ones it will be low or 0. 551 552This task can increase its UCLAMP_MIN value every time it misses the deadline 553to ensure on next wake up it runs at a higher performance point. It should try 554to approach the lowest UCLAMP_MIN value that allows to meet its deadline on any 555particular system to achieve the best possible perf/watt for that system. 556 557On heterogeneous systems, it might be important for this task to run on 558a faster CPU. 559 560**Generally it is advised to perceive the input as performance level or point 561which will imply both task placement and frequency selection**. 562 5634.2. Cap background tasks 564------------------------- 565 566Like explained for Android case in the introduction. Any app can lower 567UCLAMP_MAX for some background tasks that don't care about performance but 568could end up being busy and consume unnecessary system resources on the system. 569 5704.3. Powersave mode 571------------------- 572 573sched_util_clamp_max system wide interface can be used to limit all tasks from 574operating at the higher performance points which are usually energy 575inefficient. 576 577This is not unique to uclamp as one can achieve the same by reducing max 578frequency of the cpufreq governor. It can be considered a more convenient 579alternative interface. 580 5814.4. Per-app performance restriction 582------------------------------------ 583 584Middleware/Utility can provide the user an option to set UCLAMP_MIN/MAX for an 585app every time it is executed to guarantee a minimum performance point and/or 586limit it from draining system power at the cost of reduced performance for 587these apps. 588 589If you want to prevent your laptop from heating up while on the go from 590compiling the kernel and happy to sacrifice performance to save power, but 591still would like to keep your browser performance intact, uclamp makes it 592possible. 593 5945. Limitations 595============== 596 597.. _uclamp-capping-fail: 598 5995.1. Capping frequency with uclamp_max fails under certain conditions 600--------------------------------------------------------------------- 601 602If task p0 is capped to run at 512: 603 604:: 605 606 p0->uclamp[UCLAMP_MAX] = 512 607 608and it shares the rq with p1 which is free to run at any performance point: 609 610:: 611 612 p1->uclamp[UCLAMP_MAX] = 1024 613 614then due to max aggregation the rq will be allowed to reach max performance 615point: 616 617:: 618 619 rq->uclamp[UCLAMP_MAX] = max(512, 1024) = 1024 620 621Assuming both p0 and p1 have UCLAMP_MIN = 0, then the frequency selection for 622the rq will depend on the actual utilization value of the tasks. 623 624If p1 is a small task but p0 is a CPU intensive task, then due to the fact that 625both are running at the same rq, p1 will cause the frequency capping to be left 626from the rq although p1, which is allowed to run at any performance point, 627doesn't actually need to run at that frequency. 628 6295.2. UCLAMP_MAX can break PELT (util_avg) signal 630------------------------------------------------ 631 632PELT assumes that frequency will always increase as the signals grow to ensure 633there's always some idle time on the CPU. But with UCLAMP_MAX, this frequency 634increase will be prevented which can lead to no idle time in some 635circumstances. When there's no idle time, a task will stuck in a busy loop, 636which would result in util_avg being 1024. 637 638Combing with issue described below, this can lead to unwanted frequency spikes 639when severely capped tasks share the rq with a small non capped task. 640 641As an example if task p, which have: 642 643:: 644 645 p0->util_avg = 300 646 p0->uclamp[UCLAMP_MAX] = 0 647 648wakes up on an idle CPU, then it will run at min frequency (Fmin) this 649CPU is capable of. The max CPU frequency (Fmax) matters here as well, 650since it designates the shortest computational time to finish the task's 651work on this CPU. 652 653:: 654 655 rq->uclamp[UCLAMP_MAX] = 0 656 657If the ratio of Fmax/Fmin is 3, then maximum value will be: 658 659:: 660 661 300 * (Fmax/Fmin) = 900 662 663which indicates the CPU will still see idle time since 900 is < 1024. The 664_actual_ util_avg will not be 900 though, but somewhere between 300 and 900. As 665long as there's idle time, p->util_avg updates will be off by a some margin, 666but not proportional to Fmax/Fmin. 667 668:: 669 670 p0->util_avg = 300 + small_error 671 672Now if the ratio of Fmax/Fmin is 4, the maximum value becomes: 673 674:: 675 676 300 * (Fmax/Fmin) = 1200 677 678which is higher than 1024 and indicates that the CPU has no idle time. When 679this happens, then the _actual_ util_avg will become: 680 681:: 682 683 p0->util_avg = 1024 684 685If task p1 wakes up on this CPU, which have: 686 687:: 688 689 p1->util_avg = 200 690 p1->uclamp[UCLAMP_MAX] = 1024 691 692then the effective UCLAMP_MAX for the CPU will be 1024 according to max 693aggregation rule. But since the capped p0 task was running and throttled 694severely, then the rq->util_avg will be: 695 696:: 697 698 p0->util_avg = 1024 699 p1->util_avg = 200 700 701 rq->util_avg = 1024 702 rq->uclamp[UCLAMP_MAX] = 1024 703 704Hence lead to a frequency spike since if p0 wasn't throttled we should get: 705 706:: 707 708 p0->util_avg = 300 709 p1->util_avg = 200 710 711 rq->util_avg = 500 712 713and run somewhere near mid performance point of that CPU, not the Fmax we get. 714 7155.3. Schedutil response time issues 716----------------------------------- 717 718schedutil has three limitations: 719 720 1. Hardware takes non-zero time to respond to any frequency change 721 request. On some platforms can be in the order of few ms. 722 2. Non fast-switch systems require a worker deadline thread to wake up 723 and perform the frequency change, which adds measurable overhead. 724 3. schedutil rate_limit_us drops any requests during this rate_limit_us 725 window. 726 727If a relatively small task is doing critical job and requires a certain 728performance point when it wakes up and starts running, then all these 729limitations will prevent it from getting what it wants in the time scale it 730expects. 731 732This limitation is not only impactful when using uclamp, but will be more 733prevalent as we no longer gradually ramp up or down. We could easily be 734jumping between frequencies depending on the order tasks wake up, and their 735respective uclamp values. 736 737We regard that as a limitation of the capabilities of the underlying system 738itself. 739 740There is room to improve the behavior of schedutil rate_limit_us, but not much 741to be done for 1 or 2. They are considered hard limitations of the system. 742