Home
last modified time | relevance | path

Searched hist:"2 aba2b25f13b175ea751e438ef2929d4451cf7a7" (Results 1 – 1 of 1) sorted by relevance

/openbmc/phosphor-power/phosphor-power-supply/
H A Dpsu_manager.hppdiff 2aba2b25f13b175ea751e438ef2929d4451cf7a7 Mon Oct 11 11:00:05 CDT 2021 Adriana Kobylak <anoo@us.ibm.com> psu-ng: Bump the psu validation timeout

It was observed that during a BMC reset at runtime, other processes may
slow down the EM signal generation and the validation function would run
and log an error because not all the information about present power
supplies was in D-Bus yet.

Bump the timeout to 10s to avoid any false errors. This does not block
any processes from running.

Tested: Verified with debug traces that the validation runs 10s after
the timer is started.

Change-Id: I0aa64bcea504f604b49b06151b1391c72aa16cc6
Signed-off-by: Adriana Kobylak <anoo@us.ibm.com>