Lines Matching full:schedule
554 * __schedule_ubi_work - schedule a work.
556 * @wrk: the work to schedule
575 * schedule_ubi_work - schedule a work.
577 * @wrk: the work to schedule
593 * schedule_erase - schedule an erase work.
610 dbg_wl("schedule erasure of PEB %d, EC %d, torture %d", in schedule_erase()
801 * detected. It is better to schedule this PEB for
892 * Well, the target PEB was put meanwhile, schedule it for
909 * have been changed, schedule it for erasure.
972 * ensure_wear_leveling - schedule wear-leveling if it is needed.
1002 * We schedule wear-leveling only if the difference between the
1012 dbg_wl("schedule wear-leveling");
1014 dbg_wl("schedule scrubbing");
1107 /* Re-schedule the LEB for erasure */
1281 * ubi_wl_scrub_peb - schedule a physical eraseblock for scrubbing.
1283 * @pnum: the physical eraseblock to schedule
1294 ubi_msg(ubi, "schedule PEB %d for scrubbing", pnum);
1465 schedule();
1645 /* Schedule wear-leveling if needed */